zlacker

[parent] [thread] 0 comments
1. pfdiet+(OP)[view] [source] 2024-06-18 20:08:10
This is a bit misleading. Pumped hydro needs vertical relieve, but in places where vertical relief exists the potential is very large. It does not need to be on or even near any existing watercourse (although it can be piggybacked onto a reservoir that is, by adding another reservoir at higher elevation.)
[go to top]