zlacker

[parent] [thread] 0 comments
1. zahrev+(OP)[view] [source] 2026-02-08 23:15:47
The system could be set up to automatically refund, if your PR wasn't checked for over $AVERAGE_TIME_TO_FIRST_REVIEW$ days. The variable is specific to the project, and even can be recalculated regularly and be parameterized with PR size.
[go to top]