zlacker

[parent] [thread] 0 comments
1. kwhite+(OP)[view] [source] 2023-01-13 10:53:34
The North Sea Link between Norway and the UK is already up and running and has a capacity of 1.4 GW. It is currently (10:53 UTC) supplying 3% of the UK load.

See https://gridwatch.templar.co.uk/

[go to top]