Because there are bottlenecks in capacity on the synchronous grid that restrict the amount of power that can be moved from north-to-south (or vice-versa).
It works out better/cheaper/easier to bypass those bottlenecks with efficient undersea HVDC links than to try and build more terrestrial AC transmission lines.