zlacker

[parent] [thread] 1 comments
1. mwcamp+(OP)[view] [source] 2021-08-06 14:04:49
> The Big Boss is a pressure kind of guy, he believes that people work best when they are under pressure and if pressure isn't applied, they waste a lot of time on unnecessary things. [...] he goes away thinking what he already knew, that engineering is just screwing around instead of getting the project done.

Sadly, he's often not wrong. My own work ethic isn't exemplary, and sometimes in the absence of pressure I slack off. I'm surely not the only one. I don't know what to do about it though.

replies(1): >>52-6F-+G4
2. 52-6F-+G4[view] [source] 2021-08-06 14:27:11
>>mwcamp+(OP)
Reframe the question: is it slacking off or is it restorative mental break?

Just speaking for myself, but I think better when I'm not pinched between two projects both demanding preference and priority over the other. I can maintain a clearer mind when I don't have people breathing down my neck about deadlines they set and then broke.

Sure, one learns to navigate those situations and maintain an even keel, but still one is obligated to respond in a professional manner to those inquiries and meetings and other emotionally manipulative games people play to get their way when in a crunch. Working through those things still requires time out of day and energy out of mind. Both of those latter resources are limited.

[go to top]