zlacker

[return to "xAI joins SpaceX"]
1. rybosw+u5[view] [source] 2026-02-02 22:10:52
>>g-mork+(OP)
> The basic math is that launching a million tons per year of satellites generating 100 kW of compute power per ton would add 100 gigawatts of AI compute capacity annually, with no ongoing operational or maintenance needs. Ultimately, there is a path to launching 1 TW/year from Earth.

> My estimate is that within 2 to 3 years, the lowest cost way to generate AI compute will be in space.

This is so obviously false. For one thing, in what fantasy world would the ongoing operational and maintenance needs be 0?

◧◩
2. wongar+z8[view] [source] 2026-02-02 22:21:58
>>rybosw+u5
You operate them like Microsoft's submerged data center project: you don't do maintenance, whatever fails fails. You start with enough redundancy in critical components like power and networking and accept that compute resources will slowly decrease as nodes fail

No operational needs is obviously ... simplified. You still need to manage downlink capacity, station keeping, collision avoidance, etc. But for a large constellation the per-satellite cost of that would be pretty small.

◧◩◪
3. jackyi+ga[view] [source] 2026-02-02 22:28:08
>>wongar+z8
Unless I missed something the Microsoft underwater data center was basically a publicity stunt.

Anyone who thinks it makes sense to blast data centers into space has never seen how big and heavy they are, or thought about their immense power consumption, much less the challenge of radiating away that much waste heat into space.

[go to top]