If the electric grid — particularly the interconnection queue — is already the bottleneck to data center deployment, is something on this scale even close to possible? If it's a rationalized policy framework (big if!), I would guess there's some major permitting reform announcement coming soon.
I doubt the US choice of energy generation is ideological as much a practicality. China absolutely dominates renewables with 80% of solar PV modules manufactured in China and 95% of wafers manufactured in China.[3] China installed a world record 277GW of new solar PV generation in 2024 which was a 45% year-on-year increase.[4] By contract, the US only installed ~1/10th this capacity in 2024 with only 14GW of solar PV generation installed in the first half of 2024.[5]
[1] https://en.wikipedia.org/wiki/Cost_of_electricity_by_source
[2] https://www.iea.org/data-and-statistics/charts/lcoe-and-valu...
[3] https://www.iea.org/reports/advancing-clean-technology-manuf...
[4] https://www.pv-magazine.com/2025/01/21/china-hits-277-17-gw-...
[5] https://www.energy.gov/eere/solar/quarterly-solar-industry-u...