1. measur+Wa[view] [source] 2026-02-04 23:58:26
>>modele+(OP)
Yes, yes, we are all going to be living in an automated & luxurious communist utopia. Here are some material facts to ground the exuberance: 1) Lifecycel of typical GPU in a data center is 1-3 years, 2) Buildout is already limited by production capacity & will hit production walls by 2027-2028 when turnover matches & exceeds production capacity, 3) TSMCs projected capacity is ~130k wafers/month & it is not keeping up w/ demand which is more than doubling, 4) Power consumption for these "geniuses" & "thinking rocks" in data centers requires lots of power & the capacity was saturated in 2025, 5) So along w/ production capacity limitations power production is now another gating factor.

Anyway, like data centers in space there are lots of material limitations that all of these exuberant "ZOMG rocks can think now" essays all sweep under the rug to drive a very biased narrative about what is actually happening & the fact that all those binary bits are produced by real materials that have lifecycles & production limits not visible in the digital artifacts.

◧◩
2. zozbot+Rh[view] [source] 2026-02-05 00:47:35
>>measur+Wa
GPU lifecycle is 1-3 years because GPUs are becoming obsolete for cutting-edge work (especially re: power use) in that timeframe. This is good news if you'd like to see expanded use of AI. Production walls at fabs will matter little since future silicon dies will be capable of far more per unit area than current ones, so there will be plenty of incentive to upgrade.
[go to top]