1. ZeroGr+k8[view] [source] 2023-01-12 19:48:13
>>RobinL+(OP)
Curtailment, like negative prices, seems like something that it is hard for people to have constructive conversations about.

Probably the cheapest and best option is to build more wind and not care too much if it increases curtailment.

Yes, all the things mentioned should be looked into and done when it makes financial sense but "wasting wind" is much less a thing to worry about than "burning gas", and I'd rather waste wind than waste money.

◧◩
2. redlea+ud[view] [source] 2023-01-12 20:13:19
>>ZeroGr+k8
Balancing a nationwide power grid is very complex. Some energy sources can be started and stopped instantly, but are limited - water. Others are plentiful, but unpredictable - wind. Others are predictable, but take a long time to start and stop - gas, coal(several hours), nuclear(1 day to start, fast to stop, but very expensive). A balanced grid will need all of them, will need them in quantities which can cover faults in the big producers(a nuclear reactor makes 700-800 MW). They will need them built in the right place, because while more power cables can be built, you can't transfer a lot of power on very long distances, for cost and grid stability reasons.
◧◩◪
3. _visge+kp[view] [source] 2023-01-12 21:17:45
>>redlea+ud
> Others are predictable, but take a long time to start and stop - gas, coal(several hours), nuclear(1 day to start, fast to stop, but very expensive).

The start time is long but that does not say much about the overall operations.

> Modern nuclear plants with light water reactors are designed to have maneuvering capabilities in the 30-100% range with 5%/minute slope, up to 140 MW/minute

https://en.wikipedia.org/wiki/Load-following_power_plant

and https://thundersaidenergy.com/downloads/power-plants-cold-st...

> In France, with an average of 2 reactors out of 3 available for load variations, the overall power adjustment capacity of the nuclear fleet equates to 21,000 MW (i.e. equivalent to the output of 21 reactors) in less than 30 minutes.

https://www.powermag.com/flexible-operation-of-nuclear-power...